This topic includes resources relating to the broader sewerage network, including pipes and pumps, divided into qldwater resources, other resources, presentations and webinars.
HPWJ Sample Safe Work Method Statement - Release Date 25-Feb-2025: -
This sample Safe Work Method Statements (SWMS) was developed by Urban Utilities and their contractors, Veolia and WSP combined with collaboration between qldwater, the regulator, and unions to ensure worker safety before undertaking high risk construction work such as high pressure water jetting of Asbestos containing piping and the method of work must be carried out in accordance with the approved SWMS.The primary purpose of the High Pressure Water Jetting Asbestos Piping SWMS is to ensure the businesses, sites, supervisors, workers and contractors of the Queensland waste and resource recovery industry understand the hazards involved with the processes and undertake high pressure water jetting of Asbestos piping using the low risk, safe control measures described in the SWMS.
Infrastructure Cost Review Aug 2019 - Release Date 09-Sep-2019: - 2019 – Infrastructure Cliff? Queensland’s ageing water and sewerage assets. 2. Cost implications for in-ground assets.- Research Report 5.2: In-ground asset costs analysis.
Sewage Infrastructure Buffer Zones for Service Providers - Release Date 22-Sep-2017: - Guidelines to assist sewerage service provider employees in responding to requests from planning authorities regarding development of land near or within sewerage infrastructure buffer zones.
Sewerage Infrastructure Buffer Zones for Planners - Release Date 22-Sep-2017: - Guidelines to assist planning authorities regarding development of land near or within sewerage infrastructure buffer zones to prevent development encroaching inappropriately into sewerage infrastructure buffer zones.
Building over Infrastructure - Letter to Minister - Release Date 03-Mar-2016: - Covering letter sent with The Building over infrastructure position paper above to the Minister for Housing and Public Works, The Hon Mick de Brenni. Members must log in to access this document.
Building over Infrastructure Services - final position paper - Release Date 03-Mar-2016: - Final position paper which was endorsed by the qldwater Technical Reference Group on 26 February 2016. This position paper and the letter below has been provided to the Minister for Housing and Public Works, The Hon Mick de Brenni. Members must log in to access this document.
qldwater Position Paper Pump Station Regulation - Release Date 01-Apr-2014: - The regulation of sewage pump stations has been problematic for Queensland service providers since its introduction in 2009. Continued negotiation with the Regulator has resulted in current Regulation becoming increasingly practical, but in early 2014 the Department proposed a dramatic change in the way that this issue is managed. The proposal is for an Industry Code of Practice which could have significant benefits for sewage service providers but also create new risks.
WIW-NWP250 - Release Date 23-Jul-2014: - Water Training: NWP250 – Construct and Install Wastewater Pipelines
WIW-NWP255 - Release Date 23-Jul-2014: - Water Training: NWP255B – Maintain and Repair Wastewater Collection Assets
WIW-NWP308B - Release Date 23-Jul-2014: - Water Training: NWP308B Test and Commission Wastewater Collection Systems
WIW-NWP311B - Release Date 23-Jul-2014: - Water Training: NWP311B – Monitor and Operate Wastewater Collection and Transfer Systems
WIW-NWP330B - Release Date 23-Jul-2014: - Water Training: NWP330B Establish positions of underground utilities using locating devices
WIW-NWP335B - Release Date 23-Jul-2014: - Water Training: NWP335B – Monitor and Control Maintenance of Wastewater Collection and Transfer Assets
WIW-NWP338B - Release Date 23-Jul-2014: - Water Training: NWP338 – Perform Odour and Infiltration Investigations
WIW-NWP339B - Release Date 23-Jul-2014: - Water Training: NWP339 – Perform Leak Detection
Cutting, Handling and Disposal of Asbestos Cement (AC) Pipe Guidelines - Updated June 2014 - Release Date 20-Jun-2014: - Cutting, Handling & Disposal of Asbestos Cement (AC) Pipe Guidelines - Updated version June 2014
Asbestos Cement Pipe Cutting Guidelines June 2014 - Release Date 05-Sep-2017: - Asbestos Cement Pipe Cutting Guidelines - policy and procedures
qldwater Contents for Industry Guidelines for Pump Stations - Release Date 16-Oct-2013: - This document provides a list of the issues to be covered in the industry guidelines for initial consultation with the industry and the Department relating to Standard Conditions for Sewage Pump Stations under ERA 63(2).
Urban Water Industry Comments - Release Date 07-Aug-2012: - Urban Water Industry Comments - MP 1.4 Building Over or Near Sewers, Stormwater Drains or Water Mains - Collated comments from the industry expert panel informed by the outcomes of the last Building Codes Queensland meeting. The broader industry is invited to provide comment either directly to Building Codes Queensland to qldwater - hgold@qldwater.com.au
Cert 2 PDF learning object - Release Date 11-Aug-2011: - Copy of the Maintain and Repair Wastewater Collection Assets learning object.
Cert 3 PDF learning object - Release Date 11-Aug-2011: - qldwater e-Learning training document for Monitor control maintenance of wastewater collection assets
Sewage Incident Response Manual - Release Date 02-Apr-2010: - Industry template for a WSP-specific manual for responding to sewage overflow incidents and meet Queensland environmental legislation. Created by qldwater with input from members. | Available for modification by members. |
Wet and Dry Well Maintenance Manual - Release Date 04-Dec-2009: - Manual and template for best practice maintenance of wet and dry well pumping stations. Created by qldwater for use by members. | Available for update by members. |
Building Over or Near Local Government Water Infrastructure - Release Date 24-Feb-2009: - Standard policy and technical guidelines for issues relating to building (on private land) over or near to existing council water infrastructure. Developed using existing industry policies (with thanks to those members who participated), as well as technical and legal advice. | Free member download (modifiable). | Buy from Bookshop. |
Essentials Webinar 2 Presentation Jeff Rohdmann - Release Date 01-May-2020: - Essentials Webinar Series #2 Presentation: Sewer Network Odour & Corrosion Control by Jeff Rhodmann (Bundaberg Regional Council)
CTM Water Alliance Sewage Pumping Stations Standard Drawing - Release Date 10-Feb-2020: - Sample document from Cairns Townsville Mackay Water Alliance: Sewerage pump station standard drawing: typical sit and locality plan.
Changes to EPP Air 2019 - Release Date 23-May-2019: - Summary of changes to the Draft EPP Air consultation 2019.
Changes to EPP Noise 2019 - Release Date 23-May-2019: - Changes to EPP Noise consultation 2019
Changes to EPP Regulation 2019 - Release Date 23-May-2019: - Changes to the EPP Regulation consultation 2019
Draft EPP Air 2019 - Release Date 23-May-2019: - Draft EPP Air Consultation document 2019.
Draft EPP Water 2019 - Release Date 23-May-2019: - Draft of the 2019 EPP Water consultation document 2019.
Draft EP Regulation 2019 Consultation - Release Date 23-May-2019: - Draft of the new EP Regulation showing changes from current version.
Alarm Workshop Outcomes - Defining CCPs - Release Date 22-May-2017: - This document is provided as a related accompanying document to the Remote Treatment Operations guideline below. We thank the author of this document, Goulburn Valley Water for providing this document for our members.
Environmental Services Practice Alert 2014 Sewage Pumping Stations - Release Date 01-May-2014: - Following on from Practice alert 5/2013 – Sewage pumping station overflows, condition 10 of the standard conditions in the code of environmental compliance does not permit sewage pumping stations to have a release to land or waters under any circumstances. This condition has been shown to be inflexible as it does not take into consideration pumping stations are often designed to release during heavy rainfall. Proponents may apply for an amendment to vary this condition on existing approvals, or
BCQ Explanatory Notes (Att 2) - Release Date 18-Sep-2012: - Explanatory note to Draft Qld Development Code
Sewage pumping stations ERA 63(3) - Release Date 05-Apr-2012: - DERM Guidelines on permit requirements for sewage pumping stations in accordance with the provisions of the Environmental Protection Regulation 2008. It also gives advice on the operation of sewerage networks, including pump stations and overflow structures, to minimise the occurrence of (and environmental impacts from) overflows of sewage.
NMP 1.4 - Excavation and Piling near Sewers, Stormwater Drains and Water Mains - Release Date 21-Sep-2011: - See Plumbing Newsflash #480 on a proposal to mandate the current non-mandatory part 1.4 of the QDC 1.4. The Department of Local Government and Planning is seeking feedback on this proposal.
Plumbing Newsflash 480 - QDC 1.4 - Release Date 21-Sep-2011: - Plumbing Newsflash #480. | Comment sought on proposal to mandate the current Non-Mandatory Part 1.4 of the Queensland Development Code - Excavation and Piling Near Sewers, Stormwater Drains and Water Mains and have the Building and Development Dispute Resolution Committees (BDDRC) hear appeals on these matters. |
DERM Pump Station Guideline - Sept 2011 - Release Date 02-Sep-2011: - This guideline provides details of the development approval requirements for sewage pumping stations in accordance with the provisions of the Environmental Protection Regulation 2008 (EP Reg).
DERM TMP Guidance Documents 308 AM Sewer I-I Management - Release Date 01-Jan-2008: -
Help us populate this page by sending your sample documents to dgralton@qldwater.com.au. Please specify any conditions of use:
A. No restrictions on distribution (will be stored on protected area of web site, however if there is a request to share with a non-member we can do so)
B. Can be available to qldwater members (protected area of web site)
C. Other conditions which might allow it to be used more openly i.e. certain parts de-identified, costs removed etc.
HPWJ Sample Safe Work Method Statement - Release Date 25-Feb-2025: -
This sample Safe Work Method Statements (SWMS) was developed by Urban Utilities and their contractors, Veolia and WSP combined with collaboration between qldwater, the regulator, and unions to ensure worker safety before undertaking high risk construction work such as high pressure water jetting of Asbestos containing piping and the method of work must be carried out in accordance with the approved SWMS.The primary purpose of the High Pressure Water Jetting Asbestos Piping SWMS is to ensure the businesses, sites, supervisors, workers and contractors of the Queensland waste and resource recovery industry understand the hazards involved with the processes and undertake high pressure water jetting of Asbestos piping using the low risk, safe control measures described in the SWMS.
UU-Advisory-UK-Wet-Weather-Overflows-Journey - Release Date 13-Dec-2023: - This document was kindly shared by the Urban Utilities Futures Team as part of their Watchtower materials. Authored by Annabel Hofstee, it contains background information about the impacts of sewage releases into waterways in the UK and the impacts of a media campaign on water service providers, the regulator and on communities.
QWRAP DASB SPS Drawings - Release Date 26-Mar-2020: - QWRAP Downs and Surat Basin (DASB) Region sewage pumping station standard drawings for a soft starter station 4.0-60kW pumps.
QWRAP DASB SPS Drawings DOL - Release Date 26-Mar-2020: - QWRAP Downs and Surat Basin (DASB) Region sewage pumping station standard drawings for a Direct Online Start Station 0.0-6.0 kW Pumps
CTM Water Alliance Sewage Pumping Stations Standard Drawing - Release Date 10-Feb-2020: - Sample document from Cairns Townsville Mackay Water Alliance: Sewerage pump station standard drawing: typical sit and locality plan.
QUU Arc Flash Hazard Assessment - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Work Instruction W158 Arc Flash Hazard Assessment & PPE Selection
QUU Drawings 11kV Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - 11kV Switchboard Protection Line Diagram
QUU Drawings Cable Schedule - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Cable Schedule
QUU Drawings Control System - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings Control System Network Diagram Comms Architecture
QUU Drawings DC Power Supply Panel - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - DC Power Supply Panel Single Line Diagram 24VDC Dstribution
QUU Drawings Distribution Board - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Distribution Board Single Line Diagram 400VAC & 230VAC
QUU Drawings Distribution SWBD - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Distribution SWBD Single Line Diagram 24VDC Distribution
QUU Drawings Electrical Drawing Index - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings Electrical Drawing Index
QUU Drawings Equipment Schedule - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Equipment Schedule
QUU Drawings Field Device Connection DIA Flow Switches - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Field Device Connection Diagram Flow Switches
QUU Drawings Field Device Connection DIA Level Switches - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Field Device Connection Diagram Level Switches
QUU Drawings Field Device Connection DIA Solenoid Valves - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Field Device Connection Diagram Solenoid Valves
QUU Drawings General Arrangement Construction Details - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - General Arrangement Construction Details
QUU Drawings General Arrangement Construction Details 2 - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - General Arrangement Construction Details
QUU Drawings General Arrangement Local Control Panel - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - General Arrangement Local Control Panel
QUU Drawings General Arrangement Main Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - General Arrangement Main Switchboard
QUU Drawings General Arrangement Motor Control Centre - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - General Arrangement Motor Control Centre
QUU Drawings General Arrangement Outdoor Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - General Arrangement Outdoor Switchboard
QUU Drawings General Arrangement PLC & Communication Panel - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - General Arrangement PLC & Communication Panel
QUU Drawings Instrument Loop Diagram Flow Transmitter - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Instrument Loop Diagram Flow Transmitter
QUU Drawings Instrument Loop Diagram Level Relay - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Instrument Loop Diagram Level Relay
QUU Drawings Instrument Loop Diagram Level Transmitter - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Instrument Loop Diagram Level Transmitter
QUU Drawings Label Schedule - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Label Schedule
QUU Drawings LV Power Cable Block Diagram - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - LV Power Cable Block Diagram
QUU Drawings Main Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Main Switchboard Single Line Diagram 400VAC & 230VAC
QUU Drawings Main Switchboard Schematic Diagram - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Main Switchboard Schematic Diagram Incomer ACB
QUU Drawings Main Switchboard Schematic Diagram Auto Transfer Switch - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Main Switchboard Schematic Diagram Auto Transfer Switch
QUU Drawings Main Switchboard Schematic Diagram UPS - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Main Switchboard Schematic Diagram UPS
QUU Drawings Main Switchboard Termination Diagram - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Main Switchboard Termination Diagram PLC Layout Diagram
QUU Drawings Main Switchboard Termination Diagram PLC Layout - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Main Switchboard Termination Diagram PLC Layout Diagram
QUU Drawings MCC Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - MCC Switchboard Single Line Diagram
QUU Drawings PLC Panel - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Panel, Single Line Diagram 24VDC Distribution
QUU Drawings PLC Termination Diagram - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Digital Input Card - 16PT
QUU Drawings PLC Termination Diagram 32PT - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Digital Input Card - 32PT
QUU Drawings PLC Termination Diagram Analog Input Card 12PT - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Analog Input Card 12PT
QUU Drawings PLC Termination Diagram Analog Input Card 8PT - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Analog Input Card - 8PT
QUU Drawings PLC Termination Diagram Analog Output Card 8PT - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Analog Output Card - 8PT
QUU Drawings PLC Termination Diagram Digital Input Card 16PT - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Digital Input Card - 16PT
QUU Drawings PLC Termination Diagram Digital Input Card 32PT - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Digital Input Card - 32PT
QUU Drawings PLC Termination Diagram Digital Output Card 16PT - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - PLC Termination Diagram Digital Output Card 16PT
QUU Drawings Schematic Diagram DOL Reversing Starter - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Schematic Diagram DOL Reversing Starter
QUU Drawings Schematic Diagram DOL Starter - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Schematic Diagram DOL Starter
QUU Drawings Schematic Diagram Modulating Control Valve - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Schematic Diagram Modulating Control Valve
QUU Drawings Schematic Diagram Motorised Control Valve - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Schematic Diagram Motorised Control Valve
QUU Drawings Schematic Diagram VSD Starter 75kW - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Schematic Diagram VSD Starter 75kW and above
QUU Drawings Schematic Diagram VSD Starter Under 75kW - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Schematic Diagram VSD Starter Under 75kW
QUU Drawings Standard Electrical Symbols - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Standard Electrical Symbols
QUU Drawings Termination Diagram DOL Reversing Starter - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Termination Diagram DOL Reversing Starter
QUU Drawings Termination Diagram DOL Starter - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Termination Diagram DOL Starter
QUU Drawings Termination Diagram Modulating Control Valve - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Termination Diagram Modulating Control Valve
QUU Drawings Termination Diagram Motorised Control Valve - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Termination Diagram Motorised Control Valve
QUU Drawings Termination Diagram VSD Starter 75kW and Above - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Termination Diagram VSD Starter 75kW and above
QUU Drawings Termination Diagram VSD Starter Under 75kW - Release Date 06-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings - Termination Diagram VSD Starter Under 75kW
QUU Drawings UPS Distribution Board - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Typical EI&C Drawings UPS Distribution Board Single Line Diagram 230VAC
QUU Equipment Datasheet 11kV Cabling - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR873 11kV Cabling - 120mm2 HD/XLPE
QUU Equipment Datasheet AC Uninterruptible Power Supply - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR638 AC Uninterruptible Power Supply
QUU Equipment Datasheet DC Power Supply and Batteries - Release Date 05-Dec-2017: - Queensland Urban Utilities Equipment Datasheet FOR624 DC Power Supply & Batteries
QUU Equipment Datasheet Demountable Switchroom - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR871 Demountable Switchroom
QUU Equipment Datasheet Distribution Transformer - Release Date 05-Dec-2017: - Queensland Urban Utilities Datasheet FOR619 Distribution Transformer
QUU Equipment Datasheet Distribution Transformer 500kVA Dry Type - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR872 Distribution Transformer 500 kVA Dry Type Transformer
QUU Equipment Datasheet Earth Transformer Dry Type - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR994 Earth Transformer - Dry Type
QUU Equipment Datasheet HV Motors - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR874 HV Motors
QUU Equipment Datasheet HV Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR875 HV Switchoard
QUU Equipment Datasheet LV Diesel Power Generator - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR880 LV Diesel Power Generator <100 kVA
QUU Equipment Datasheet LV Diesel Power Generator 100-500 kVA - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR881 LV Diesel Power Generator (100 - 500 kVA)
QUU Equipment Datasheet LV Diesel Power Generator >500 kVA - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR882 LV Diesel Power Generator >500 kVA
QUU Equipment Datasheet LV Distribution Board - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR637 LV Distribution Board
QUU Equipment Datasheet LV Motor - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR876 LV Motor
QUU Equipment Datasheet LV Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR870 LV Switchboard
QUU Equipment Datasheet LV Switchboard Less 400A - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR943 LV Switchboard <400A
QUU Equipment Datasheet Padmount RMU - Release Date 05-Dec-2017: - Queensland Urban Utilities Equipment Datasheet FOR622 Padmount RMU
QUU Equipment Datasheet Padmount Substation - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR877 Padmount Substation
QUU Equipment Datasheet Variable Speed Drive - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR878 Variable Speed Drive
QUU Equipment Datasheet Ventillation Fan Switchboard - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Equipment Datasheet FOR879 Ventillation Fan Switchboard
QUU General Requirements for Hazardous Area Installation - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: General Requirements for Installation of Electrical Equipment in Hazardous Areas TMS1203
QUU Power System Analysis Guidelines TEM336 - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications - Power System Analysis Guidelines TEM336
QUU Safety in Design Report - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Safety in Design Report TMS1436
QUU Supplier Data Requirements List - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Supplier Data Requirements List - Mechanical Documents CHE486
QUU Technical Specifications AC Uninterrupted Power Supplies - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications AC Uninterrupted Power Supplies TMS 1187
QUU Technical Specifications Cathodic Protection of Pipelines and Structures - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Cathodic Protection of Pipelines and Structures TMS1595
QUU Technical Specifications Control Panels - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Control Panels TMS1222
QUU Technical Specifications Control System Implementation - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Control System Implementation TMS1202
QUU Technical Specifications DC Power Supply Systems for HV Switchgear - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications DC Power Supply Systems for HV Switchgear TMS1221
QUU Technical Specifications Distribution Power Transformers Less 5MVA - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Distribution Power Transformers (less than 5MVA) TMS 1185
QUU Technical Specifications Dry Type Distribution Transformers - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Dry Type Distribution Transformers (Less than 5MVA) TMS1624
QUU Technical Specifications Electrical Installation - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Electrical Installation TMS1200
QUU Technical Specifications Electrical Instrumentation and Control System Design - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Electrical, Instrumentation and Control System Design Criteria TMS1648
QUU Technical Specifications High Voltage Motors - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications High Voltage Motors TMS1404
QUU Technical Specifications High Voltage Switchboards - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications High Voltage Switchboards TMS 1186
QUU Technical Specifications Instrumentation Installation - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Instrumentation Installation TMS1201
QUU Technical Specifications Low Voltage Diesel Powered Generators - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Low Voltage Diesel Powered Generators TMS1589
QUU Technical Specifications Low Voltage Switchboards and Enclosures - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Low Voltage Switchboards and Enclosures TMS60
QUU Technical Specifications Low Voltage Variable Speed Drives - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications Low Voltage Variable Speed Drives TMS1406
QUU Technical Specifications LV Electrical AC Motors - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications LV Electric AC Motors TMS1637
QUU Technical Specifications LV Generators Arc Flash Analysis - Release Date 05-Dec-2017: - Queensland Urban Utilities sample document: Technical Specifications - Power System Analysis Report for LV Generators Arc Flash Analysis
We have collated interesting presentations from our events over the years. We thank our presenters for allowing us to share their knowledge.
Essentials Webinar HPWJ Exemption Presentation - Release Date 04-Apr-2025: - Following the announcement by the Office of Industrial Relations to grant an HPWJ exemption for sewer cleaning to the urban water sector in Queensland, this webinar provided an opportunity to hear industry experts break down the background and regulatory framework of the exemption, the research findings on asbestos risks in wastewater networks and the development and implementation of a Safe Work Method Statement.
Fundamentals Webinar Inflow Infiltration - Release Date 10-Nov-2022: - Dominique Keirens, Executive Coordinator - Network Assets Engineering Network Reliability at the City of Gold Coast, presents the Fundamentals of Inflow and Infiltration.
Annual Forum Presentation Bill Turnham Julian Brown - Release Date 19-Sep-2022: -
Bill and Julian provided an overview of Waste ID electronic tracking as part of the Trade Waste Toolbox at City of Gold Coast.
Port Douglas Regional Conference Amanda Hancock - Release Date 07-Jun-2022: -
Port Douglas Regional Conference presentation by Amanda Hancock, FNQROC: Sewer Relining Program
Fundamentals Webinar 6 Backflow Awareness - Release Date 29-Jan-2021: - Murray Thompson highlights the importance of awareness and control over cross connections. The presentation include examples of good and bad practice and links to further resources.
2020 Atherton Conference Presentation Kezia Drane - Release Date 13-Oct-2020: - Atherton Conference presentation by Kezia Drane, James Cook University: Water and Sewerage Research for Townsville City Council
2020 Atherton Conference Presentation Laura Kuskopf - Release Date 13-Oct-2020: - Atherton Conference presentation by Laura Kuskopf, James Cook University: Water and Sewerage Research for Townsville City Council
Essentials Webinar #13 Yarong Song - Release Date 21-Aug-2020: - Essentials Webinar #13 Presentation by Dr Yarong Song from the Advanced Water Management Centre at the University of Queensland. Protect Sewer: Investigate sewer corrosion using multidisciplinary techniques
Essentials Webinar 12 Neels Kloppers - Release Date 24-Jul-2020: - Essentials Webinar #12 - Presentation by Neels Kloppers. Neels is Gladstone RC’s Manager Asset Performance and Monitoring and has been responsible for attempting to drive improvement in councils’ renewal programs. His presentation will include a bit of history on various technologies trialled including CCTV assessment and video interpretation, data management and other network infrastructure condition assessment activities.
Essentials Webinar #8 Shaun Johnston - Release Date 01-Jun-2020: - Essentials Webinar #8: Presentation by Shaun Johnston, Burdekin Shire Council - Old style asset management still has a place.
Essentials Webinar 2 Presentation Jeff Rohdmann - Release Date 01-May-2020: - Essentials Webinar Series #2 Presentation: Sewer Network Odour & Corrosion Control by Jeff Rhodmann (Bundaberg Regional Council)
2019 Hervey Bay Presentation Charndeep Chahal - Release Date 30-Jul-2019: - Hervey Bay Regional Conference 2019: Presentation by Charndeep Chahal, Bundaberg Regional Council - Sewer Network Corrosion and Odour Control
2019 Hervey Bay Presentation Michael Doherty - Release Date 30-Jul-2019: - Hervey Bay Regional Conference 2019 Presentation: Michael Doherty, Gympie Regional Council - The SCADA journey for our infrastructure
2019 Townsville Presentation DBYD - Release Date 15-Jul-2019: - Townsville Mini Conference July 2019 - presentation by Terry O'Keeffe, DBYD: Is your organisation ahead of the game?
2019 Townsville Presentation Shaun Johnston - Release Date 15-Jul-2019: - Townsville Mini Conference July 2019 - presentation by Shaun Johnston, Burdekin Shire Council: PFAS - The Saga.
2019 Asset Management Workshop Presentation Rob and Ryan - Release Date 18-Jun-2019: - 2019 Asset Management Workshop Presentation: Infrastructure Cliff? Queensland's ageing water and sewer assets report and cost implications for in-ground assets. Rob Fearon and Ryan Cosgrove, qldwater
2019 Asset Management Workshop Presentation Stuart Wilson - Release Date 18-Jun-2019: - 2019 Asset Management Workshop Presentation: WSAA's Strategic Asset Management initiative and the "bow wave" by Stuart Wilson, WSAA
2019 Contaminants Workshop National initiatives for dealing with PFAS - Release Date 17-May-2019: - 2019 Emerging Contaminants Workshop presentation: Simone Ventura, DES - National initiatives for dealing with PFAS
2019 Contaminants Workshop Update on research on emerging contaminants in effluent - Release Date 17-May-2019: - 2019 Emerging Contaminants Workshop presentation: Jochen Mueller, UQ - Update on research on emerging contaminants in effluent
2019 Biloela Conference Presentation REMOTE Worker - Release Date 08-Apr-2019: - 2019 Biloela Conference presentation by Susan Petersen from Gladstone Regional Council - Remote Lone Worker Procedures
2019 Biloela Conference Presentation Terry DBYD - Release Date 08-Apr-2019: - 2019 Biloela Conference Presentation Terry O'Keeffe DBYD
2019 Biloela Safety Training HPWJ how safely are you operating_V3 - Release Date 08-Apr-2019: - 2019 Biloela safety training presentation by Murray Thomson.
2018 Annual Forum Preso DES Utilities and Government Organisations Assessment - Release Date 13-Sep-2018: - 2018 Annual Forum Presentation by Chris Mooney, Department of Environment and Science: Utilities and Government Organisations Assessment.
2018 Annual Forum Preso Future STP Stewardship - Release Date 13-Sep-2018: - 2018 Annual Forum Presentation by Rob Fearon, qldwater: Future STP Stewardship: catchment resilience in a changing environment.
2018 Annual Forum Preso Qld Reef Water Quality Program - Release Date 13-Sep-2018: - 2018 Annual Forum Presentation by Meg Bickle, Office of the Great Barrier Reef: Urban best management practice and stewardship framework- ERA63 urban framework development.
2018 Bundaberg Preso Chris Mooney DES - Release Date 13-Aug-2018: - qldwater Regional Conference Bundaberg 9 August 2018 - Presentation by Chris Mooney, Department of Environment and Science: DES update including regulatory framework, innovative technologies.
2018 Bundaberg Preso Jeanette Harrold WBW - Release Date 13-Aug-2018: - qldwater Regional Conference Bundaberg 9 August 2018 - Presentation by Jeanette Harrold and Ben McClatchie from Wide Bay Water: How do we eat an elephant called DES? Translating regulation into specification.
2018 Goondiwindi Preso Regulator - Release Date 27-Jul-2018: - 2018 SWQ Conference Goondiwindi Presentation by Chris Mooney and Chris Hill, DNRME: Compliance and Enforcement overview.
2018 Goondiwindi Preso Ryan Cosgrove - Release Date 23-Jul-2018: - Goondiwindi Regional Conference 2018 - presentation by Ryan Cosgrove: Infrastructure Cliff - Fact or Fiction?
2018 Cloncurry Presentation Chris Mooney DES - Release Date 29-Oct-2018: - Cloncurry Regional Conference May 2018. Presentation by Chris Mooney, DES Update from the environmental regulator.
2018 Cloncurry Presentation Terry OKeeffe DBYD - Release Date 30-Oct-2018: - Cloncurry Regional Conference 2018. Presentation by Terry O'Keeffe from Dial Before You Dig - Protecting Assets.
2018 Skills Forum Presentation Brad Milfull LCC - Release Date 30-Oct-2018: - Skills Forum 2018. Presentation by Brad Milfull, Logan City Council: Water Industry Worker Training Program - the Logan City Council experience 2009 to 2018 (and into the future).
2018 Skills Forum Presentation Kent Weeden CoGC - Release Date 30-Oct-2018: - Skills Forum 2018. Presentation by Kent Weeden, City of Gold Coast: Experiences with implementing the Water Industry Worker training program in SEQ.
2017 NQ Conference Mackay Presentation Robin Hagen Isaac Regional Council - Release Date 19-Jul-2017: - 2017 NQ Conference Mackay. Presentation by Robin Hagen, Isaac Regional Council: Water and Wastewater Management Challenges in Isaac
2017 Leakage Management Workshop Presentation Fraser Coast - Release Date 12-Jun-2017: - 2017 Leakage Management Workshop presentation by Fraser Coast Regional Council
2017 South West Queensland Conference Dalby Presentation Paul O'Kane Consultancy Services - Release Date 03-Mar-2017: - 2017 South West Queensland Conference Dalby. Presentation by Paul O'Kane, Consultancy Services: Why have a Standard Switchboard/RTU Panel - Improving Costs, Performance, Efficiency & SAFETY
2016 Innovation Forum Presentation Cameron Jackson Queensland Urban Utilities - Release Date 15-Sep-2016: - Innovation Forum 2016. Presentation by Cameron Jackson, Queensland Urban Utilities: Lower Brisbane River Nutrient ‘Bubble’ Licence
2016 Innovation Forum Presentation Linda Pearson Mackay Regional Council - Release Date 15-Sep-2016: - Innovation Forum 2016. Presentation by Linda Pearson, Mackay Regional Council: Sewer Sensors
2016 Innovation Forum Presentation Richard Petterson Urban Utilities - Release Date 15-Sep-2016: - Innovation Forum 2016. Presentation by Richard Petterson, Urban Utilities: Case Study: Transferring Business, Planned Maintenance (Peter Best)
2016 Emerald Central Highlands Regional Conference Presentation Ed Dahlheimer - Release Date 11-Aug-2016: - Emerald Central Highlands Regional Conference 2016. Presentation by Ed Dahlheimer, Gladstone Regional Council: Gladstone Regional Council Curtis Island Sewerage Infrastructure
2016 Townsville North Queensland Regional Conference Presentation Terry O'Keeffe Dial Before You Dig - Release Date 20-Jul-2016: - Townsville North Queensland Regional Conference 2016 Presentation by Terry O'Keeffe, Dial Before You Dig: DBYD LOCATOR CERTIFICATION
Craig Ma Innovation Event presentation - Release Date 26-Nov-2015: -
2015 Gold Coast Conference Presentation Scott Casey Bundaberg Regional Council - Release Date 20-Aug-2015: - Gold Coast SEQ Regional Conference 2015. Presentation by Scott Casey, Bundaberg Regional Council: Work management systems
2015 Rockhampton Regional Conference Presentation Linda Pearson Mackay Regional Council - Release Date 16-Apr-2015: - Rockhampton Regional Conference 2015. Presentation by Linda Pearson, Mackay Regional Council: Inflow & Infiltration, What problem are we trying to solve?
The Fundamentals of Pumping Specific Energy
Water Network,Sewage Network | 25-Jan-2024
View WebinarThe Fundamentals of Inflow and Infiltration
Sewage Network | 10-Nov-2022
View WebinarThe Fundamentals of Electrical Safety
Water Network,Sewage Network | 27-Apr-2021
View WebinarYour comments can help us develop our systems and services now and for the future. Let us know what you think. If your feedback required a response, we will be in contact.